Skip to main content

Equipment procurement and project supply

Containerized Mining Farm Equipment

Equipment procurement and project supply for containerised sites: containers, the miners they are built around, and the power and heat-rejection equipment each one connects to.
Two rows of containerised mining units facing each other across a gravel lane
Rows of containerised mining units at Hut 8's site in Medicine Hat, Alberta, 2018. Shown as an example of a containerised deployment; it is not our project.

Equipment scope

SystemEquipment
ContainersAir-cooled, hydro or immersion mining containers
Mining hardwareThe miner model each container is built for
PowerTransformers, switchgear, container feeders
Heat rejectionDry coolers or cooling towers for hydro and immersion containers
LogisticsHeavy freight to port and site, shipping documents

Why operators build with containers

A mining container arrives with racking, power distribution and cooling manifolds or ventilation already fitted. Site works reduce to a foundation, a power connection, a network connection and, for hydro and immersion units, a connection to heat rejection. Capacity can be added one container at a time as power becomes available.

Matching a container to its miners

A container is not generic. It is built around one miner model's dimensions and power connection and, for hydro, its flow, pressure and connector type. The reliable order of decisions is:

  1. Choose the cooling type the site's climate and budget support.
  2. Choose the miner model.
  3. Specify the container for that model and for the site's supply voltage.
  4. Size transformers and heat rejection for the number of containers.

Buying the container and the miners as one scope avoids the most expensive mistake in containerised mining: a container whose manifold, rack pitch or electrical distribution does not fit the machines.

What we supply and what you arrange

We supply containers, miners and supporting equipment as a procurement scope and coordinate freight. Site preparation, electrical connection, installation and commissioning are carried out by your own engineers and contractors.

Most efficient miners listed

Lowest stated J/TH, one per model family.

Send your project brief

Capacity, voltage and destination are the three facts that let us propose matched equipment in the first reply.

Equipment required
Your details

Include the country code.

City or port, if different from your country.

Order preferences (optional)
Site details (optional, helps us specify the right equipment)

e.g. 415 V three-phase, 480 V, 11 kV supply

We reply by email. Your details are used only to answer this request.

Questions

How much capacity does one container hold?

It depends on the container design and the miner model. A container's specification states the miner count it holds and its total power capacity; your quotation shows both for the specific model chosen.

Can a container be reused with a newer miner generation?

Sometimes. It depends on whether the new model shares the chassis dimensions, power connection and, for hydro, the coolant connector and flow requirements of the model the container was built for. Ask for a compatibility check before ordering replacement miners.