Market · 120/240 V split-phase, 120/208 V and 277/480 V three-phase, 60 Hz

Bitcoin Miners for the United States

ASIC miners for US operators, from a single machine on a 240 V circuit to hosted and self-built facilities on 277/480 V three-phase supply.

Voltage and electrical supply in United States

US supply is 60 Hz. Homes receive 120/240 V split-phase; commercial and industrial buildings are usually supplied at 120/208 V or 277/480 V three-phase.

Almost no industrial miner runs on a 120 V outlet. Air-cooled miners with a 200–240 V input run on a 240 V residential circuit or line-to-line on a 208 V system. Models whose input range extends to 277 V can be connected line-to-neutral on a 277/480 V system, which is why large US facilities favour them: no step-down transformer is needed between the 480 V distribution and the miner.

Hydro-cooled models are commonly specified for 380–415 V three-phase, which is not a standard US service voltage. US hydro deployments typically use transformers with a 415 V secondary, or container systems built with that conversion included. Check the input range on each product page.

SupplyConnectionListed miners that accept it
120 VStandard household outlet2 of 93
208 VLine-to-line on 120/208 V commercial three-phase23 of 93
240 VResidential split-phase 240 V circuit53 of 93
277 VLine-to-neutral on 277/480 V three-phase15 of 93
480 V three-phaseLine-to-line on 277/480 V9 of 93

Counted from the input-voltage range stated for each miner, for the 93 listed miners with a stated range. Nominal supply values; actual site voltage varies. Have a qualified electrician confirm your supply, breakers and cabling.

Cooling for the US climate

The US spans every climate a mining site can face. Air cooling suits northern and high-plains sites for most of the year. Sites in the South and Southwest must design for summer peaks; evaporative assistance, hydro cooling and immersion are widely used there. Noise ordinances also matter for air-cooled sites near residential areas.

Most efficient miners compatible with US supply

Lowest J/TH among listed models whose published input range includes a standard US supply voltage.

Bitcoin mining in United States

The United States is the largest mining location in recent survey evidence. The Cambridge Centre for Alternative Finance (CCAF) Digital Mining Industry Report of April 2025, based on survey data as of 30 June 2024 from firms representing about 48% of network hashrate, attributed 75.4% of respondents' mining activity to the United States, while cautioning that United States activity may be overstated in its sample and that other sources suggest a much lower share of 36%.

In February 2024 the Energy Information Administration estimated that cryptocurrency mining probably accounts for 0.6% to 2.3% of national electricity consumption. It had identified 137 mining facilities in 21 states, most in Texas, Georgia and New York, and reported operators relocating to gain a larger share of renewable energy and a Pennsylvania operation supplied directly by an adjacent nuclear plant.

Rules for mining in United States

New York: on 22 November 2022 the state enacted chapter 628 of 2022, which for two years from its effective date barred the Department of Environmental Conservation from issuing new air permits, or renewals that increase mining load, for power plants burning carbon-based fuel that supply behind-the-meter electricity to proof-of-work cryptocurrency mining. It also required a generic environmental impact statement on such operations.

Texas: the grid operator ERCOT runs a "Batch Zero" interconnection process for large loads. Facilities of 75 MW or more are directed to a specific eligibility path, and a new standalone large load needs an approved ERCOT form before it can be energised.

Federal: on 1 February 2024 the Energy Information Administration announced an emergency survey of cryptocurrency miners' electricity use, planned to run from February to July 2024; it has since discontinued that collection.

As published by the sources listed below on the date they were checked. Rules change: confirm the current position with the authorities or a local adviser before you buy.

How purchasing works

Orders are handled the same way for every destination and scale with quantity:

  • 1–4 units: online checkout on products that show a price and a confirmed availability status.
  • 5–19 units: checkout or a volume quote.
  • 20 units and above: a wholesale quotation covering unit price, batch, freight and delivery terms.
  • 100 units and above, or a full site: handled by mining sales as a procurement project.

Where a product shows "Availability on request" or "Available", stock is not held in a warehouse; lead time is confirmed on your quotation.

Shipping to United States

Standard shipping to United States is free on every order. If you need it faster, choose express shipping at checkout and we quote it before payment is requested.

Request Express Quote

Importing into United States

U.S. Customs and Border Protection (CBP) clears imports. The importer of record is ultimately responsible for the correctness of the entry documentation and for all applicable duties, taxes and fees. CBP does not require a licence or permit to import, although other agencies may require a permit, licence or other certification depending on the commodity. Many importers use a customs broker; brokers are licensed by CBP but are not CBP employees.

In its rulings CBP has classified cryptocurrency miners under heading 8543 of the Harmonized Tariff Schedule (electrical machines and apparatus having individual functions), for example HQ H310388 of 28 July 2020. The current tariff text and duty rates are published by the U.S. International Trade Commission. Trade-remedy measures enforced by CBP, such as Section 301 duties on certain products from China, can add to the duty, so the total depends on classification and origin and changes over time.

Infrastructure for larger deployments

Beyond a few machines, the miners are one line of the bill of materials. Transformers, switchgear, PDUs, racking, cooling and containers are specified around the miner model and the site's supply voltage, and can be quoted as one procurement scope.

Sources

Checked on October 11, 2026.

Other markets in North America

Wholesale & project supply

Supplying a mining operation in United States?

Send models, quantity, destination and available electrical capacity. Sales replies with equipment options, delivery terms and lead time.