Bitmain
Antminer S23 XP Hyd.
- Hashrate
- 600TH/s
- Power
- 5,340W
- Efficiency
- 8.9J/TH
- Hydro-cooled
- SHA-256
$14,535$24.23/TH

Global ASIC mining equipment distributor
Bitcoin miners, mining infrastructure and wholesale procurement for individual operators and multi-megawatt mining farms.
Mining Farm Solutions





The most efficient new model of each manufacturer and cooling type, lowest joules per terahash first.
Bitmain
$14,535$24.23/TH
Bitdeer
$9,499.05$10.72/TH
Bitdeer
$3,799.05$11.31/TH
Bitmain
$7,931.55$26.01/TH
MicroBT
$8,264.05$17.51/TH
Bitaxe
$84.55$65.04/TH
Newest by stated release date.
Bitdeer
$8,264.05$12.15/TH
Bitdeer
$3,799.05$11.31/TH
Bitdeer
$9,499.05$10.72/TH
Bitmain
$9,024.05$10.43/TH
Canaan
$5,699.05$19/TH
Canaan
$4,416.55$15.66/TH
Lowest listed price per TH/s among new miners.
Bitmain
$308.90$2.19/TH
Bitmain
$282.15$2.56/TH
Bitmain
$664.05$2.58/TH
Bitmain
$350.55$2.92/TH
Bitmain
$949.05$3.4/TH
Bitmain
$474.05$3.54/TH




Also listed: Innosilicon, Lucky Miner, StrongU, Anexminer, Baikal, Bombax, Dayun, FusionSilicon, Hummer, iBeLink, LoyalTech, Pinecone, WindMiners, Thor, DragonBall, Heatbit, Spondoolies, VolcMiner, Magicminer, Ebang, Auradine, Proto, Goldshell, Iceriver, iPollo, ElphaPex, Jasminer, FutureBit, Hammer Miner, Bitaxe, NerdMiner, Fluminer, GekkoScience.
Mining tools
Estimate mining economics using current network and electricity inputs.
Estimated mining results
Antminer S23 XP Hyd.
Bitcoin (BTC) · SHA-256
Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.
Network data as of 2026-10-28 11:00 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.1398 BTC
Compare
Compare specifications, efficiency and estimated operating economics, two to four machines side by side.


| Metric | Miner 1Antminer S23 XP Hyd. | Miner 2SEALMINER A4 Ultra Hydro |
|---|---|---|
| Hashrate | 600 TH/s | 886 TH/s |
| Power | 5,340 W | 8,373 W |
| Efficiency | 8.9 J/TH | 9.45 J/TH |
| Price | $14,535 | $9,499.05 |
| Est. operating result / day | $13.82 | $19.71 (the better value on this measure) |
Operating result: estimated revenue less electricity at $0.06/kWh and a 2% pool fee. An estimate, not a promise of earnings. Shading marks the better value on the chosen measure only.

Volume pricing · international sourcing · mixed models · full-container orders · farm procurement
Listed with their stated condition. Figures are the model's rating as a new unit, not measurements of the unit on offer: ask for its test results and photographs.
Standard shipping is free on every order to every destination we ship to. If you need it faster, choose express shipping at checkout and we quote it for your destination before you pay. Import duties and taxes follow the destination country's rules and are not included unless your quotation says so.
Shipping PolicyOctober 1, 2026
Follow the build sequence for a mining farm, from securing power and choosing cooling to electrical design, procurement, commissioning and operations.
Read moreOctober 1, 2026
Work out the voltage, current, circuit capacity and connectors a Bitcoin miner needs before you order it, so you can brief your electrician.
Read moreOctober 1, 2026
Set up a maintenance programme for ASIC miners covering what to monitor, how often to inspect and clean, firmware updates, spares and records.
Read moreOctober 1, 2026
Set your power, noise and cooling limits, read a miner listing correctly, vet the seller, pay safely and test the machine when it arrives.
Read moreCrypto Miners Direct LLC · 59-20 Borden Ave, Maspeth, NY 11378