Skip to main content

Tool · estimates only

Whatsminer M70S 260T Profitability Calculator

The MicroBT Whatsminer M70S 260T is rated at 260 TH/s and 3,140 W (12.1 J/TH), air-cooled. Set your electricity price to see estimated output and running cost under current network conditions.
1. Select minerView specs
TH/s
W
4. Electricity price (USD per kWh)
units
%
Advanced settingsNetwork inputs, uptime, hosting and more

Set by the selected miner. Choosing another coin switches to a custom configuration.

USD
%
$/kWh
$/month

The block reward includes the average transaction fees (subsidy 3.125 BTC + average fees 0.0140 BTC). Hosting per kWh is added to the electricity price; the fixed charge is per machine for 30 days.

Estimated mining results

Whatsminer M70S 260T

Bitcoin (BTC) · SHA-256

BTC mined / day
0.00011445
0.0034 BTC / 30 days
Gross revenue / day
$9.24
$277 / 30 days
Electricity cost / day
$4.52
$136 / 30 days
Net operating result / day
$4.72
$142 / 30 days
Break-even electricity
$0.1226/kWh
Revenue per TH/s
$0.0355/day
Energy / day
75.4 kWh
Energy / 30 days
2,261 kWh

Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.

Network data as of 2026-10-28 13:45 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.139 BTC

View Whatsminer M70S 260T

Whatsminer M70S 260T at different electricity prices

Under today's network conditions the Whatsminer M70S 260T breaks even on electricity at about $0.123/kWh. Below that price estimated revenue exceeds the electricity bill; above it, it does not.

Power priceElectricity / dayElectricity / 30 daysEst. revenue / dayEst. net / dayEst. net / 30 days
$0.03/kWh$2.26$68$9.24$6.98$209
$0.04/kWh$3.01$90$9.24$6.23$187
$0.05/kWh$3.77$113$9.24$5.47$164
$0.06/kWh$4.52$136$9.24$4.72$142
$0.07/kWh$5.28$158$9.24$3.96$119
$0.08/kWh$6.03$181$9.24$3.21$96
$0.10/kWh$7.54$226$9.24$1.70$51

Power and energy at scale

Electrical load and energy for the miners alone, from rated power. Site load is higher once cooling and distribution losses are added.

UnitsHashrateMiner loadEnergy / dayEnergy / 30 daysEst. BTC / 30 days
1260 TH/s3.1 kW75 kWh2,261 kWh0.00343
102.6 PH/s31.4 kW754 kWh22,608 kWh0.03434
10026 PH/s314 kW7,536 kWh226,080 kWh0.34336
1,000260 PH/s3.14 MW75,360 kWh2,260,800 kWh3.434

Planning 100 units or more? Speak with mining sales.

Network inputs used on this page

Bitcoin price
$80,730
mempool.space
Network difficulty
140.58 T
mempool.space
Block reward
3.1390 BTC
subsidy + average fees
Pool fee / uptime
2% / 100%
calculator defaults

Estimates, not a promise of earnings. Figures are calculated from the inputs shown, using network data as of 2026-10-28 13:45 UTC, and assume difficulty and price stay constant, which they do not. Hardware cost, cooling overhead, downtime, taxes and depreciation are not included.

Related

Wholesale & project supply

Need the Whatsminer M70S 260T in volume?

Bulk ASIC procurement for mining farms, hosting companies, resellers and institutional operators. Send model, quantity and destination; sales replies with pricing and lead time.