Skip to main content

Tool · estimates only

Antminer S21j XP Hyd. Profitability Calculator

The Bitmain Antminer S21j XP Hyd. is rated at 495 TH/s and 5,940 W (12 J/TH), hydro-cooled. Set your electricity price to see estimated output and running cost under current network conditions.
1. Select minerView specs
TH/s
W
4. Electricity price (USD per kWh)
units
%
Advanced settingsNetwork inputs, uptime, hosting and more

Set by the selected miner. Choosing another coin switches to a custom configuration.

USD
%
$/kWh
$/month

The block reward includes the average transaction fees (subsidy 3.125 BTC + average fees 0.0140 BTC). Hosting per kWh is added to the electricity price; the fixed charge is per machine for 30 days.

Estimated mining results

Antminer S21j XP Hyd.

Bitcoin (BTC) · SHA-256

BTC mined / day
0.00021790
0.0065 BTC / 30 days
Gross revenue / day
$17.59
$528 / 30 days
Electricity cost / day
$8.55
$257 / 30 days
Net operating result / day
$9.04
$271 / 30 days
Break-even electricity
$0.1234/kWh
Revenue per TH/s
$0.0355/day
Energy / day
142.6 kWh
Energy / 30 days
4,277 kWh

Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.

Network data as of 2026-10-28 13:45 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.139 BTC

View Antminer S21j XP Hyd.

Antminer S21j XP Hyd. at different electricity prices

Under today's network conditions the Antminer S21j XP Hyd. breaks even on electricity at about $0.123/kWh. Below that price estimated revenue exceeds the electricity bill; above it, it does not.

Power priceElectricity / dayElectricity / 30 daysEst. revenue / dayEst. net / dayEst. net / 30 days
$0.03/kWh$4.28$128$17.59$13.31$399
$0.04/kWh$5.70$171$17.59$11.89$357
$0.05/kWh$7.13$214$17.59$10.46$314
$0.06/kWh$8.55$257$17.59$9.04$271
$0.07/kWh$9.98$299$17.59$7.61$228
$0.08/kWh$11.40$342$17.59$6.19$186
$0.10/kWh$14.26$428$17.59$3.34$100

Power and energy at scale

Electrical load and energy for the miners alone, from rated power. Site load is higher once cooling and distribution losses are added.

UnitsHashrateMiner loadEnergy / dayEnergy / 30 daysEst. BTC / 30 days
1495 TH/s5.9 kW143 kWh4,277 kWh0.00654
104.95 PH/s59.4 kW1,426 kWh42,768 kWh0.06537
10049.5 PH/s594 kW14,256 kWh427,680 kWh0.65371
1,000495 PH/s5.94 MW142,560 kWh4,276,800 kWh6.537

Planning 100 units or more? Speak with mining sales.

Network inputs used on this page

Bitcoin price
$80,730
mempool.space
Network difficulty
140.58 T
mempool.space
Block reward
3.1390 BTC
subsidy + average fees
Pool fee / uptime
2% / 100%
calculator defaults

Estimates, not a promise of earnings. Figures are calculated from the inputs shown, using network data as of 2026-10-28 13:45 UTC, and assume difficulty and price stay constant, which they do not. Hardware cost, cooling overhead, downtime, taxes and depreciation are not included.

Related

Wholesale & project supply

Need the Antminer S21j XP Hyd. in volume?

Bulk ASIC procurement for mining farms, hosting companies, resellers and institutional operators. Send model, quantity and destination; sales replies with pricing and lead time.