Skip to main content

Tool · estimates only

Antminer S19e XP Hyd. 251T Profitability Calculator

The Bitmain Antminer S19e XP Hyd. 251T is rated at 251 TH/s and 5,522 W (22 J/TH), hydro-cooled. Set your electricity price to see estimated output and running cost under current network conditions.
1. Select minerView specs
TH/s
W
4. Electricity price (USD per kWh)
units
%
Advanced settingsNetwork inputs, uptime, hosting and more

Set by the selected miner. Choosing another coin switches to a custom configuration.

USD
%
$/kWh
$/month

The block reward includes the average transaction fees (subsidy 3.125 BTC + average fees 0.0140 BTC). Hosting per kWh is added to the electricity price; the fixed charge is per machine for 30 days.

Estimated mining results

Antminer S19e XP Hyd. 251T

Bitcoin (BTC) · SHA-256

BTC mined / day
0.00011049
0.0033 BTC / 30 days
Gross revenue / day
$8.92
$268 / 30 days
Electricity cost / day
$7.95
$239 / 30 days
Net operating result / day
$0.97
$29 / 30 days
Break-even electricity
$0.0673/kWh
Revenue per TH/s
$0.0355/day
Energy / day
132.5 kWh
Energy / 30 days
3,976 kWh

Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.

Network data as of 2026-10-28 13:45 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.139 BTC

View Antminer S19e XP Hyd. 251T

Antminer S19e XP Hyd. 251T at different electricity prices

Under today's network conditions the Antminer S19e XP Hyd. 251T breaks even on electricity at about $0.067/kWh. Below that price estimated revenue exceeds the electricity bill; above it, it does not.

Power priceElectricity / dayElectricity / 30 daysEst. revenue / dayEst. net / dayEst. net / 30 days
$0.03/kWh$3.98$119$8.92$4.94$148
$0.04/kWh$5.30$159$8.92$3.62$109
$0.05/kWh$6.63$199$8.92$2.29$69
$0.06/kWh$7.95$239$8.92$0.97$29
$0.07/kWh$9.28$278$8.92-$0.36-$11
$0.08/kWh$10.60$318$8.92-$1.68-$50
$0.10/kWh$13.25$398$8.92-$4.33-$130

Power and energy at scale

Electrical load and energy for the miners alone, from rated power. Site load is higher once cooling and distribution losses are added.

UnitsHashrateMiner loadEnergy / dayEnergy / 30 daysEst. BTC / 30 days
1251 TH/s5.5 kW133 kWh3,976 kWh0.00331
102.51 PH/s55.2 kW1,325 kWh39,758 kWh0.03315
10025.1 PH/s552.2 kW13,253 kWh397,584 kWh0.33148
1,000251 PH/s5.52 MW132,528 kWh3,975,840 kWh3.315

Planning 100 units or more? Speak with mining sales.

Network inputs used on this page

Bitcoin price
$80,730
mempool.space
Network difficulty
140.58 T
mempool.space
Block reward
3.1390 BTC
subsidy + average fees
Pool fee / uptime
2% / 100%
calculator defaults

Estimates, not a promise of earnings. Figures are calculated from the inputs shown, using network data as of 2026-10-28 13:45 UTC, and assume difficulty and price stay constant, which they do not. Hardware cost, cooling overhead, downtime, taxes and depreciation are not included.

Related

Wholesale & project supply

Need the Antminer S19e XP Hyd. 251T in volume?

Bulk ASIC procurement for mining farms, hosting companies, resellers and institutional operators. Send model, quantity and destination; sales replies with pricing and lead time.