Tool · estimates only
Antminer S19 XP+ Hyd. Profitability Calculator
Estimated mining results
Antminer S19 XP+ Hyd.
Bitcoin (BTC) · SHA-256
- BTC mined / day
- 0.00012282
- 0.0037 BTC / 30 days
- Gross revenue / day
- $9.90
- $297 / 30 days
- Electricity cost / day
- $7.63
- $229 / 30 days
- Net operating result / day
- $2.27
- $68 / 30 days
- Break-even electricity
- $0.0778/kWh
- Revenue per TH/s
- $0.0355/day
- Energy / day
- 127.2 kWh
- Energy / 30 days
- 3,817 kWh
Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.
Network data as of 2026-10-28 13:00 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.1391 BTC
Antminer S19 XP+ Hyd. at different electricity prices
Under today's network conditions the Antminer S19 XP+ Hyd. breaks even on electricity at about $0.078/kWh. Below that price estimated revenue exceeds the electricity bill; above it, it does not.
| Power price | Electricity / day | Electricity / 30 days | Est. revenue / day | Est. net / day | Est. net / 30 days |
|---|---|---|---|---|---|
| $0.03/kWh | $3.82 | $115 | $9.90 | $6.09 | $183 |
| $0.04/kWh | $5.09 | $153 | $9.90 | $4.82 | $144 |
| $0.05/kWh | $6.36 | $191 | $9.90 | $3.54 | $106 |
| $0.06/kWh | $7.63 | $229 | $9.90 | $2.27 | $68 |
| $0.07/kWh | $8.91 | $267 | $9.90 | $1.00 | $30 |
| $0.08/kWh | $10.18 | $305 | $9.90 | -$0.27 | -$8 |
| $0.10/kWh | $12.72 | $382 | $9.90 | -$2.82 | -$85 |
Power and energy at scale
Electrical load and energy for the miners alone, from rated power. Site load is higher once cooling and distribution losses are added.
| Units | Hashrate | Miner load | Energy / day | Energy / 30 days | Est. BTC / 30 days |
|---|---|---|---|---|---|
| 1 | 279 TH/s | 5.3 kW | 127 kWh | 3,817 kWh | 0.00368 |
| 10 | 2.79 PH/s | 53 kW | 1,272 kWh | 38,167 kWh | 0.03685 |
| 100 | 27.9 PH/s | 530.1 kW | 12,722 kWh | 381,672 kWh | 0.36847 |
| 1,000 | 279 PH/s | 5.3 MW | 127,224 kWh | 3,816,720 kWh | 3.685 |
Planning 100 units or more? Speak with mining sales.
Network inputs used on this page
- Bitcoin price
- $80,640
- mempool.space
- Network difficulty
- 140.58 T
- mempool.space
- Block reward
- 3.1391 BTC
- subsidy + average fees
- Pool fee / uptime
- 2% / 100%
- calculator defaults
Estimates, not a promise of earnings. Figures are calculated from the inputs shown, using network data as of 2026-10-28 13:00 UTC, and assume difficulty and price stay constant, which they do not. Hardware cost, cooling overhead, downtime, taxes and depreciation are not included.

Wholesale & project supply
Need the Antminer S19 XP+ Hyd. in volume?
Bulk ASIC procurement for mining farms, hosting companies, resellers and institutional operators. Send model, quantity and destination; sales replies with pricing and lead time.