Skip to main content

Tool · estimates only

NerdQaxe++ Rev 6.1 6T Profitability Calculator

The NerdMiner NerdQaxe++ Rev 6.1 6T is rated at 6 TH/s and 100 W (16.7 J/TH), air-cooled. Set your electricity price to see estimated output and running cost under current network conditions.
1. Select minerView specs
TH/s
W
4. Electricity price (USD per kWh)
units
%
Advanced settingsNetwork inputs, uptime, hosting and more

Set by the selected miner. Choosing another coin switches to a custom configuration.

USD
%
$/kWh
$/month

The block reward includes the average transaction fees (subsidy 3.125 BTC + average fees 0.0140 BTC). Hosting per kWh is added to the electricity price; the fixed charge is per machine for 30 days.

Estimated mining results

NerdQaxe++ Rev 6.1 6T

Bitcoin (BTC) · SHA-256

BTC mined / day
0.00000264
0.0001 BTC / 30 days
Gross revenue / day
$0.21
$6 / 30 days
Electricity cost / day
$0.14
$4 / 30 days
Net operating result / day
$0.07
$2 / 30 days
Break-even electricity
$0.0888/kWh
Revenue per TH/s
$0.0355/day
Energy / day
2.4 kWh
Energy / 30 days
72 kWh

Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.

Network data as of 2026-10-28 13:45 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.139 BTC

View NerdQaxe++ Rev 6.1 6T

NerdQaxe++ Rev 6.1 6T at different electricity prices

Under today's network conditions the NerdQaxe++ Rev 6.1 6T breaks even on electricity at about $0.089/kWh. Below that price estimated revenue exceeds the electricity bill; above it, it does not.

Power priceElectricity / dayElectricity / 30 daysEst. revenue / dayEst. net / dayEst. net / 30 days
$0.03/kWh$0.07$2$0.21$0.14$4
$0.04/kWh$0.10$3$0.21$0.12$4
$0.05/kWh$0.12$4$0.21$0.09$3
$0.06/kWh$0.14$4$0.21$0.07$2
$0.07/kWh$0.17$5$0.21$0.05$1
$0.08/kWh$0.19$6$0.21$0.02$1
$0.10/kWh$0.24$7$0.21-$0.03-$1

Power and energy at scale

Electrical load and energy for the miners alone, from rated power. Site load is higher once cooling and distribution losses are added.

UnitsHashrateMiner loadEnergy / dayEnergy / 30 daysEst. BTC / 30 days
16 TH/s0.1 kW2 kWh72 kWh0.00008
1060 TH/s1 kW24 kWh720 kWh0.00079
100600 TH/s10 kW240 kWh7,200 kWh0.00792
1,0006 PH/s100 kW2,400 kWh72,000 kWh0.07924

Planning 100 units or more? Speak with mining sales.

Network inputs used on this page

Bitcoin price
$80,730
mempool.space
Network difficulty
140.58 T
mempool.space
Block reward
3.1390 BTC
subsidy + average fees
Pool fee / uptime
2% / 100%
calculator defaults

Estimates, not a promise of earnings. Figures are calculated from the inputs shown, using network data as of 2026-10-28 13:45 UTC, and assume difficulty and price stay constant, which they do not. Hardware cost, cooling overhead, downtime, taxes and depreciation are not included.

Related

Wholesale & project supply

Need the NerdQaxe++ Rev 6.1 6T in volume?

Bulk ASIC procurement for mining farms, hosting companies, resellers and institutional operators. Send model, quantity and destination; sales replies with pricing and lead time.