Skip to main content

Tool · estimates only

LV07 1T Profitability Calculator

The Lucky Miner LV07 1T is rated at 1 TH/s and 25 W (25 J/TH), air-cooled. Set your electricity price to see estimated output and running cost under current network conditions.
1. Select minerView specs
TH/s
W
4. Electricity price (USD per kWh)
units
%
Advanced settingsNetwork inputs, uptime, hosting and more

Set by the selected miner. Choosing another coin switches to a custom configuration.

USD
%
$/kWh
$/month

The block reward includes the average transaction fees (subsidy 3.125 BTC + average fees 0.0140 BTC). Hosting per kWh is added to the electricity price; the fixed charge is per machine for 30 days.

Estimated mining results

LV07 1T

Bitcoin (BTC) · SHA-256

BTC mined / day
0.00000044
0.0000 BTC / 30 days
Gross revenue / day
$0.04
$1 / 30 days
Electricity cost / day
$0.04
$1 / 30 days
Net operating loss / day
-$0.00
-$0 / 30 days
Break-even electricity
$0.0592/kWh
Revenue per TH/s
$0.0355/day
Energy / day
0.6 kWh
Energy / 30 days
18 kWh

Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.

Network data as of 2026-10-28 13:45 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.139 BTC

View LV07 1T

LV07 1T at different electricity prices

Under today's network conditions the LV07 1T breaks even on electricity at about $0.059/kWh. Below that price estimated revenue exceeds the electricity bill; above it, it does not.

Power priceElectricity / dayElectricity / 30 daysEst. revenue / dayEst. net / dayEst. net / 30 days
$0.03/kWh$0.02$1$0.04$0.02$1
$0.04/kWh$0.02$1$0.04$0.01$0
$0.05/kWh$0.03$1$0.04$0.01$0
$0.06/kWh$0.04$1$0.04-$0.00-$0
$0.07/kWh$0.04$1$0.04-$0.01-$0
$0.08/kWh$0.05$1$0.04-$0.01-$0
$0.10/kWh$0.06$2$0.04-$0.02-$1

Power and energy at scale

Electrical load and energy for the miners alone, from rated power. Site load is higher once cooling and distribution losses are added.

UnitsHashrateMiner loadEnergy / dayEnergy / 30 daysEst. BTC / 30 days
11 TH/s0 kW1 kWh18 kWh0.00001
1010 TH/s0.3 kW6 kWh180 kWh0.00013
100100 TH/s2.5 kW60 kWh1,800 kWh0.00132
1,0001 PH/s25 kW600 kWh18,000 kWh0.01321

Planning 100 units or more? Speak with mining sales.

Network inputs used on this page

Bitcoin price
$80,730
mempool.space
Network difficulty
140.58 T
mempool.space
Block reward
3.1390 BTC
subsidy + average fees
Pool fee / uptime
2% / 100%
calculator defaults

Estimates, not a promise of earnings. Figures are calculated from the inputs shown, using network data as of 2026-10-28 13:45 UTC, and assume difficulty and price stay constant, which they do not. Hardware cost, cooling overhead, downtime, taxes and depreciation are not included.

Related

Wholesale & project supply

Need the LV07 1T in volume?

Bulk ASIC procurement for mining farms, hosting companies, resellers and institutional operators. Send model, quantity and destination; sales replies with pricing and lead time.