Tool · estimates only
Avalon 1246 85th/s Miner Profitability Calculator
Estimated mining results
Avalon 1246 85th/s Miner
Bitcoin (BTC) · SHA-256
- BTC mined / day
- 0.00003742
- 0.0011 BTC / 30 days
- Gross revenue / day
- $3.02
- $91 / 30 days
- Electricity cost / day
- $4.92
- $148 / 30 days
- Net operating loss / day
- -$1.90
- -$57 / 30 days
- Break-even electricity
- $0.0368/kWh
- Revenue per TH/s
- $0.0355/day
- Energy / day
- 82.1 kWh
- Energy / 30 days
- 2,462 kWh
Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.
Network data as of 2026-10-28 13:45 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.139 BTC
Avalon 1246 85th/s Miner at different electricity prices
Under today's network conditions the Avalon 1246 85th/s Miner breaks even on electricity at about $0.037/kWh. Below that price estimated revenue exceeds the electricity bill; above it, it does not.
| Power price | Electricity / day | Electricity / 30 days | Est. revenue / day | Est. net / day | Est. net / 30 days |
|---|---|---|---|---|---|
| $0.03/kWh | $2.46 | $74 | $3.02 | $0.56 | $17 |
| $0.04/kWh | $3.28 | $98 | $3.02 | -$0.26 | -$8 |
| $0.05/kWh | $4.10 | $123 | $3.02 | -$1.08 | -$32 |
| $0.06/kWh | $4.92 | $148 | $3.02 | -$1.90 | -$57 |
| $0.07/kWh | $5.75 | $172 | $3.02 | -$2.72 | -$82 |
| $0.08/kWh | $6.57 | $197 | $3.02 | -$3.55 | -$106 |
| $0.10/kWh | $8.21 | $246 | $3.02 | -$5.19 | -$156 |
Power and energy at scale
Electrical load and energy for the miners alone, from rated power. Site load is higher once cooling and distribution losses are added.
| Units | Hashrate | Miner load | Energy / day | Energy / 30 days | Est. BTC / 30 days |
|---|---|---|---|---|---|
| 1 | 85 TH/s | 3.4 kW | 82 kWh | 2,462 kWh | 0.00112 |
| 10 | 850 TH/s | 34.2 kW | 821 kWh | 24,624 kWh | 0.01123 |
| 100 | 8.5 PH/s | 342 kW | 8,208 kWh | 246,240 kWh | 0.11225 |
| 1,000 | 85 PH/s | 3.42 MW | 82,080 kWh | 2,462,400 kWh | 1.123 |
Planning 100 units or more? Speak with mining sales.
Network inputs used on this page
- Bitcoin price
- $80,730
- mempool.space
- Network difficulty
- 140.58 T
- mempool.space
- Block reward
- 3.1390 BTC
- subsidy + average fees
- Pool fee / uptime
- 2% / 100%
- calculator defaults
Estimates, not a promise of earnings. Figures are calculated from the inputs shown, using network data as of 2026-10-28 13:45 UTC, and assume difficulty and price stay constant, which they do not. Hardware cost, cooling overhead, downtime, taxes and depreciation are not included.
Related
- Avalon 1246 85th/s Miner specificationsProduct
- Avalon 1246 85th/s Miner vs Whatsminer M30S++ 86TComparison
- Avalon 1246 85th/s Miner vs Antminer S17+ 73th/s Used (second hand)Comparison
- Avalon 1246 85th/s Miner vs Antminer S17 Pro (53Th) Used (second hand)Comparison
- Avalon 1246 85th/s Miner vs Antminer S17 Pro 50Th/s Used (second hand)Comparison
- All miners by electricity priceTool

Wholesale & project supply
Need the Avalon 1246 85th/s Miner in volume?
Bulk ASIC procurement for mining farms, hosting companies, resellers and institutional operators. Send model, quantity and destination; sales replies with pricing and lead time.