Antminer T17E 53th/s Used (second hand) Profitability Calculator

The Bitmain Antminer T17E 53th/s Used (second hand) is rated at 53 TH/s and 2,915 W (55 J/TH), air-cooled. Set your electricity price to see estimated output and running cost under current network conditions.
1. Select minerView specs
TH/s
W
4. Electricity price (USD per kWh)
units
%
Advanced settingsNetwork inputs, uptime, hosting and more

Set by the selected miner. Choosing another coin switches to a custom configuration.

USD
%
$/kWh
$/month

The block reward includes the average transaction fees (subsidy 3.125 BTC + average fees 0.0141 BTC). Hosting per kWh is added to the electricity price; the fixed charge is per machine for 30 days.

Estimated mining results

Antminer T17E 53th/s Used (second hand)

Bitcoin (BTC) · SHA-256

BTC mined / day
0.00002333
0.0007 BTC / 30 days
Gross revenue / day
$1.88
$56 / 30 days
Electricity cost / day
$4.20
$126 / 30 days
Net operating loss / day
-$2.32
-$69 / 30 days
Break-even electricity
$0.0269/kWh
Revenue per TH/s
$0.0355/day
Energy / day
70 kWh
Energy / 30 days
2,099 kWh

Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.

Network data as of 2026-10-28 13:00 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.1391 BTC

View Antminer T17E 53th/s Used (second hand)

Antminer T17E 53th/s Used (second hand) at different electricity prices

Under today's network conditions the Antminer T17E 53th/s Used (second hand) breaks even on electricity at about $0.027/kWh. Below that price estimated revenue exceeds the electricity bill; above it, it does not.

Power priceElectricity / dayElectricity / 30 daysEst. revenue / dayEst. net / dayEst. net / 30 days
$0.03/kWh$2.10$63$1.88-$0.22-$7
$0.04/kWh$2.80$84$1.88-$0.92-$28
$0.05/kWh$3.50$105$1.88-$1.62-$48
$0.06/kWh$4.20$126$1.88-$2.32-$69
$0.07/kWh$4.90$147$1.88-$3.02-$90
$0.08/kWh$5.60$168$1.88-$3.72-$111
$0.10/kWh$7.00$210$1.88-$5.11-$153

Power and energy at scale

Electrical load and energy for the miners alone, from rated power. Site load is higher once cooling and distribution losses are added.

UnitsHashrateMiner loadEnergy / dayEnergy / 30 daysEst. BTC / 30 days
153 TH/s2.9 kW70 kWh2,099 kWh0.00070
10530 TH/s29.1 kW700 kWh20,988 kWh0.00700
1005.3 PH/s291.5 kW6,996 kWh209,880 kWh0.07000
1,00053 PH/s2.92 MW69,960 kWh2,098,800 kWh0.69995

Planning 100 units or more? Speak with mining sales.

Network inputs used on this page

Bitcoin price
$80,640
mempool.space
Network difficulty
140.58 T
mempool.space
Block reward
3.1391 BTC
subsidy + average fees
Pool fee / uptime
2% / 100%
calculator defaults

Estimates, not a promise of earnings. Figures are calculated from the inputs shown, using network data as of 2026-10-28 13:00 UTC, and assume difficulty and price stay constant, which they do not. Hardware cost, cooling overhead, downtime, taxes and depreciation are not included.

Related

Wholesale & project supply

Need the Antminer T17E 53th/s Used (second hand) in volume?

Bulk ASIC procurement for mining farms, hosting companies, resellers and institutional operators. Send model, quantity and destination; sales replies with pricing and lead time.