Skip to main content

Tool · estimates only

SEALMINER A2 Hydro Profitability Calculator

The Bitdeer SEALMINER A2 Hydro is rated at 446 TH/s and 7,359 W (16.5 J/TH), hydro-cooled. Set your electricity price to see estimated output and running cost under current network conditions.
1. Select minerView specs
TH/s
W
4. Electricity price (USD per kWh)
units
%
Advanced settingsNetwork inputs, uptime, hosting and more

Set by the selected miner. Choosing another coin switches to a custom configuration.

USD
%
$/kWh
$/month

The block reward includes the average transaction fees (subsidy 3.125 BTC + average fees 0.0140 BTC). Hosting per kWh is added to the electricity price; the fixed charge is per machine for 30 days.

Estimated mining results

SEALMINER A2 Hydro

Bitcoin (BTC) · SHA-256

BTC mined / day
0.00019633
0.0059 BTC / 30 days
Gross revenue / day
$15.85
$475 / 30 days
Electricity cost / day
$10.60
$318 / 30 days
Net operating result / day
$5.25
$158 / 30 days
Break-even electricity
$0.0897/kWh
Revenue per TH/s
$0.0355/day
Energy / day
176.6 kWh
Energy / 30 days
5,298 kWh

Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.

Network data as of 2026-10-28 13:45 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.139 BTC

View SEALMINER A2 Hydro

SEALMINER A2 Hydro at different electricity prices

Under today's network conditions the SEALMINER A2 Hydro breaks even on electricity at about $0.090/kWh. Below that price estimated revenue exceeds the electricity bill; above it, it does not.

Power priceElectricity / dayElectricity / 30 daysEst. revenue / dayEst. net / dayEst. net / 30 days
$0.03/kWh$5.30$159$15.85$10.55$317
$0.04/kWh$7.06$212$15.85$8.79$264
$0.05/kWh$8.83$265$15.85$7.02$211
$0.06/kWh$10.60$318$15.85$5.25$158
$0.07/kWh$12.36$371$15.85$3.49$105
$0.08/kWh$14.13$424$15.85$1.72$52
$0.10/kWh$17.66$530$15.85-$1.81-$54

Power and energy at scale

Electrical load and energy for the miners alone, from rated power. Site load is higher once cooling and distribution losses are added.

UnitsHashrateMiner loadEnergy / dayEnergy / 30 daysEst. BTC / 30 days
1446 TH/s7.4 kW177 kWh5,298 kWh0.00589
104.46 PH/s73.6 kW1,766 kWh52,985 kWh0.05890
10044.6 PH/s735.9 kW17,662 kWh529,848 kWh0.58900
1,000446 PH/s7.36 MW176,616 kWh5,298,480 kWh5.890

Planning 100 units or more? Speak with mining sales.

Network inputs used on this page

Bitcoin price
$80,730
mempool.space
Network difficulty
140.58 T
mempool.space
Block reward
3.1390 BTC
subsidy + average fees
Pool fee / uptime
2% / 100%
calculator defaults

Estimates, not a promise of earnings. Figures are calculated from the inputs shown, using network data as of 2026-10-28 13:45 UTC, and assume difficulty and price stay constant, which they do not. Hardware cost, cooling overhead, downtime, taxes and depreciation are not included.

Related

Wholesale & project supply

Need the SEALMINER A2 Hydro in volume?

Bulk ASIC procurement for mining farms, hosting companies, resellers and institutional operators. Send model, quantity and destination; sales replies with pricing and lead time.