Skip to main content

Tool · estimates only

Avalon A15 Pro 221T Profitability Calculator

The Canaan Avalon A15 Pro 221T is rated at 221 TH/s and 3,662 W (16.8 J/TH), air-cooled. Set your electricity price to see estimated output and running cost under current network conditions.
1. Select minerView specs
TH/s
W
4. Electricity price (USD per kWh)
units
%
Advanced settingsNetwork inputs, uptime, hosting and more

Set by the selected miner. Choosing another coin switches to a custom configuration.

USD
%
$/kWh
$/month

The block reward includes the average transaction fees (subsidy 3.125 BTC + average fees 0.0140 BTC). Hosting per kWh is added to the electricity price; the fixed charge is per machine for 30 days.

Estimated mining results

Avalon A15 Pro 221T

Bitcoin (BTC) · SHA-256

BTC mined / day
0.00009729
0.0029 BTC / 30 days
Gross revenue / day
$7.85
$236 / 30 days
Electricity cost / day
$5.27
$158 / 30 days
Net operating result / day
$2.58
$77 / 30 days
Break-even electricity
$0.0894/kWh
Revenue per TH/s
$0.0355/day
Energy / day
87.9 kWh
Energy / 30 days
2,637 kWh

Estimate only, not a promise of earnings. Calculated from the inputs shown, at constant difficulty and price. Difficulty, price, transaction fees, pool fees, uptime, hardware cost, cooling, downtime, taxes and depreciation may affect actual results.

Network data as of 2026-10-28 13:45 UTC · Price source: mempool.space · Difficulty source: mempool.space · Block reward: 3.139 BTC

View Avalon A15 Pro 221T

Avalon A15 Pro 221T at different electricity prices

Under today's network conditions the Avalon A15 Pro 221T breaks even on electricity at about $0.089/kWh. Below that price estimated revenue exceeds the electricity bill; above it, it does not.

Power priceElectricity / dayElectricity / 30 daysEst. revenue / dayEst. net / dayEst. net / 30 days
$0.03/kWh$2.64$79$7.85$5.22$157
$0.04/kWh$3.52$105$7.85$4.34$130
$0.05/kWh$4.39$132$7.85$3.46$104
$0.06/kWh$5.27$158$7.85$2.58$77
$0.07/kWh$6.15$185$7.85$1.70$51
$0.08/kWh$7.03$211$7.85$0.82$25
$0.10/kWh$8.79$264$7.85-$0.93-$28

Power and energy at scale

Electrical load and energy for the miners alone, from rated power. Site load is higher once cooling and distribution losses are added.

UnitsHashrateMiner loadEnergy / dayEnergy / 30 daysEst. BTC / 30 days
1221 TH/s3.7 kW88 kWh2,637 kWh0.00292
102.21 PH/s36.6 kW879 kWh26,366 kWh0.02919
10022.1 PH/s366.2 kW8,789 kWh263,664 kWh0.29186
1,000221 PH/s3.66 MW87,888 kWh2,636,640 kWh2.919

Planning 100 units or more? Speak with mining sales.

Network inputs used on this page

Bitcoin price
$80,730
mempool.space
Network difficulty
140.58 T
mempool.space
Block reward
3.1390 BTC
subsidy + average fees
Pool fee / uptime
2% / 100%
calculator defaults

Estimates, not a promise of earnings. Figures are calculated from the inputs shown, using network data as of 2026-10-28 13:45 UTC, and assume difficulty and price stay constant, which they do not. Hardware cost, cooling overhead, downtime, taxes and depreciation are not included.

Related

Wholesale & project supply

Need the Avalon A15 Pro 221T in volume?

Bulk ASIC procurement for mining farms, hosting companies, resellers and institutional operators. Send model, quantity and destination; sales replies with pricing and lead time.